PAF Project view

The PAF Project view contains a structured overview of the data, meta-data and recording sessions of a PAF project.

The project view in a PAF project consists of three parts:

  1. The Project data tree shows all files that are part of the project (i.e. files contained in the Data subfolder of the project root folder).

    You can use the buttons at the bottom of the project tree:

    • Add

      Add new subjects, sessions, other types as defined in the PAF settings.

    • Open

      Open the selected file.

    • Find

      Search files or folders within the PAF project.

    • Find next

      Search for the next occurrence of the current search term.

  2. The Details area allows editing the properties of the selected item (for example personal data, session details, file details).

  3. The Project automation area shows contents depending on the selected item. If the selected item is a session, this area shows fields that correspond to measurements and the Go button for data collection.

    At the top of the Project automation area there is a breadcrumb trail to navigate back to the session, subject or root level.

Project automation

The Project automation pane guides the user with the recording and processing of the files for a session as defined in the PAF settings file.

When a session has been selected, colored measurement fields appear in the Project automation area, indicating the files to be recorded for the session. The fields are grouped per measurement type and show if files are required or optional.

The following methods can be used to collect files:

  • Click a red field and select Capture.

  • Click a red field, select Edit Settings and Capture. Changes to the duration of the measurement period will be stored and be used the next time you make a measurement of the same type.

  • Click the Go button. If you click the Go button, QTM starts at the top of the file list and records all files of the first measurement type (for example static). If you click again, it continues with all measurements of the second measurement type (for example dynamic). Activate the external trigger button in Project Options > Timing and use it to control when the captures start. At any point, click the Esc key to stop the data collection.

  • Click a red field, select Import file..., and browse for an already recorded file to import it into the session.

  • Use the plus/minus button to add or remove measurement fields, for example if you need to add more captures.

Once a file has been added, the measurement field turns green. The following options are available for a recorded file:

  • Add comments by clicking the field next to the green file name.

  • Use the checkbox next to a file to enable or disable processing. Only selected files will be exported and processed.

  • To select or deselect all measurements belonging to the same group, use the multi-select checkbox above the measurement group.

Once the required files have been recorded, the Start Processing button is activated. Click the button to show the available processing steps, and click the one you want to run.

Click the Show guide button to show the marker set guide, if available.